A pre-check to size up a survey, not the MCS 020 compliance submission. England uses MCS 020 (a). Nothing is sent anywhere.
England uses MCS 020 (a), a 37.0 dB(A) limit. Scotland, Wales and Northern Ireland still use the earlier MCS 020 (42 dB(A) including a 40 dB(A) background), which this tool does not compute.
The assessment position is 1 m outside the centre of a neighbour’s nearest habitable-room window or door. Run the check for each one; the worst case governs.
A solid wall or fence that blocks the line of sight from the top of the unit to the window reduces the noise. Open or gappy fences and vegetation do not count.
Computed with the MCS 020 (a) method: LP = LW + 10·log(Q / 4πr²) minus the barrier correction, compared against 37.0 dB(A). It is a pre-check, not the MCS 020 (a) submission, and your local planning authority has the final say.

Heat pump noise pre-check
MCS 020 (a) permitted-development method (England). Not the compliance submission.
| Input | Value |
|---|---|
| Sound power level (highest datasheet figure) | |
| Directivity (reflecting surfaces) | |
| Distance to assessment position | |
| Barrier | |
| Sound pressure at the assessment position | |
| Against the 37.0 dB(A) limit |
A pre-check to size up a survey, not the MCS 020 (a) compliance submission. Results depend on the manufacturer sound power figure and the inputs chosen. Complete the official MCS 020 (a) paper form or Excel tool for the planning record; the local planning authority has the final say. Scotland, Wales and NI use the earlier MCS 020. installHUB does not issue MCS certificates.
Which standard applies. In England the governing document is MCS 020 (a) Issue 1.1, mandatory for permitted-development heat-pump installs from 20 September 2025, with a 37.0 dB(A) limit applied to the heat pump alone. Scotland, Wales and Northern Ireland still use the earlier MCS 020, which allows up to 42 dB(A) and includes a 40 dB(A) background. This calculator does the England method and is a pre-check, not the official submission: complete the MCS 020 (a) form or Excel tool from mcscertified.com for the planning record.
The job still needs surveying, documenting and, more often than not, a DNO notification, because a heat pump adds a continuous electrical load. installHUB captures the unit location, the photos and the noise working on the survey, then carries it through to the quote, the job sheet and the DNO notification without re-keying.
In England, under MCS 020 (a), the sound pressure from the heat pump must be 37.0 dB(A) or lower at the neighbour’s assessment position for the install to count as permitted development on noise. The earlier MCS 020, still used in Scotland, Wales and Northern Ireland, allowed up to 42 dB(A) and included a 40 dB(A) background in the assessment.
A point 1 m outside, and perpendicular to, the centre of the nearest window or door to a habitable room of a neighbouring property. A habitable room is one used for sleeping or living, not a bathroom, hallway, utility or similar. Run the check for each neighbouring window and door, because the worst case governs.
The highest A-weighted sound power level on the datasheet, not the low-noise or night-mode figure. The unit will not always run in its quiet mode, so the assessment has to use the worst case. For MCS-certified products the figure is published on the MCS Product Directory.
Yes. A hard surface within 1 m of the unit reflects sound back and raises the level at the window: Q2 for one surface, Q4 for two, Q8 for three. The ground counts, vegetation does not. More than three surfaces, such as a unit in a small lightwell, cannot meet the standard.
A solid barrier that blocks the line of sight from the top of the unit to the window reduces the noise. A solid masonry wall or fence at least 18 mm thick (Type 1) that fully obscures the window takes off up to 10 dB. Open, gappy or poorly maintained fences and vegetation take off nothing.
Move or raise the unit, add distance to the neighbour’s window, add a solid barrier, choose a quieter unit, or apply for full planning permission. Re-run the check after each change, and for every neighbouring window and door.
No. This is a pre-check to help you size up a survey and spot a problem early. The planning record needs the official MCS 020 (a) paper form or Excel tool from mcscertified.com, and your local planning authority has the final say. installHUB does not issue MCS certificates.