Battery storage

Software for electrical contractors installing battery storage and solar PV

A battery survey that asks about backup and usage, the G98 or G99 route worked out from the job, and the EESS commissioning report, handover and MCS battery forms from site.
The basics

What battery storage installers need from software

The terms, and where installHUB sits next to your design and monitoring tools.

Most battery storage is fitted by electrical contractors, either as a retrofit to an existing solar system or sold with new solar PV. installHUB is Installation Job Management software that runs that work from the first enquiry to the handover. The survey asks what the customer actually wants from the battery: backup in a power cut, whole house or essential circuits, how many hours, how much charge to hold in reserve, and their daily and night-time use. installHUB works out from the system size, the supply and any export limit whether the job is a G98 notification, a G99 fast-track application or a full G99, and fills in the G98 and G99 forms. On site, your field operatives complete the EESS commissioning report and the handover document on the phone, and MCS-certified installers get the MCS battery inspection and commissioning checklists from the same answers.

What does battery storage installer software do?
It runs a battery job from lead to handover: an enquiry that captures the supply and what the customer wants the battery for, a survey of the consumer unit, equipment locations and cable routes, a quote, the grid application or notification, scheduling the electricians, commissioning, the handover pack and the invoice. When the battery is sold with solar, it runs both on one job.
Why battery jobs are an electrical contractor’s job
A battery is mostly electrical work: the consumer unit, isolation, earthing, the inverter and the paperwork that proves it was tested. The grid side is stricter than many expect. In Great Britain, adding storage can move a job from a G98 notification after commissioning to a G99 application that needs the DNO’s answer before anything goes in.
Where installHUB sits
installHUB runs the job, the forms, the grid paperwork and the certificates. It doesn’t size the battery for the customer, simulate savings or connect to inverter monitoring.
When you don’t need it
If batteries are an occasional add-on and your certificate app already covers the paperwork, you may not. It earns its place once battery and solar jobs are a steady part of the work and the grid step is holding installs up.
The flow

From the backup question to the commissioning report

Eight steps, on one platform.
1

The enquiry captures the supply and the system

The customer describes the property and their electricity, scans their MPAN from their bill and adds photos. The proposed system records on or off grid, AC or DC coupling, the battery and inverter make and model, and the storage and usable capacity.

2

The survey asks what the battery is for

Will power be needed if the grid goes down? Whole house or essential circuits? For how many hours, and with how much charge held in reserve? How will it charge, what’s the daily use and how much of it is at night? Then the supply, meter and earthing, the consumer unit and existing installation, equipment locations and cable routes, and risks, signed off by the customer and surveyor.

3

The grid route is worked out for you

From the recorded system size, the supply phases and any export limit, installHUB works out whether the job is a G98 notification after commissioning, a G99 fast-track application or a full G99 application, and prints it on the survey documents. Northern Ireland jobs follow the NIE Networks rules.

4

The grid paperwork is filled in

Submit through ENA Connect Direct, or generate G98 Form B, the G99 A1.1 application or the G99 A3.1 form as PDFs for the DNO. The checklist reminds you to get the DNO’s approval before the install is booked, and blocks the job closing until the commissioning notification is sent (UK).

5

The right person signs each document

On the Pro plan, book a battery job as a crew: an electrician and a fitter on one visit, each with their trade. Each document follows its trade, so the electrical certificate is signed by the person who holds that trade on the job.

6

Install day on the phone

A pre-start site check (risk assessment read, changes since the survey, suspected asbestos, safe access), inverter and battery serial numbers scanned with the camera, and photos of the inverter, the battery with any barriers or fire protection, isolators and labels, the consumer unit and the CT clamp.

7

The EESS paperwork comes from the job

installHUB produces the battery storage site technical survey, the EESS commissioning report, the battery storage handover document, an electrical installation and testing certificate and the risk assessments. For MCS-certified installers, it adds the MCS survey form and the MCS battery storage inspection and commissioning checklists, unless the system is above the 50 kW MCS limit.

8

The battery goes on an annual health check

Sign the customer up to the ready-made battery annual health check from the finished job, and installHUB creates each visit and reminds them.

Solar and battery together

Solar and battery on one job

Sell solar and battery together and they run as one job type, with one survey, one quote, one schedule and one invoice. The grid route counts all the generation and storage on the premises, so the job asks for the application it really needs. Fitting a battery to an existing solar system? Start from the battery forms; the survey records the existing installation.

For the roof side, see solar PV installer software.

The grid step

G98 or G99, decided from the job

In Great Britain, generation and storage up to 16 A per phase is a G98 notification within 28 days of commissioning. Above that, the job needs G99: the fast track for smaller export-limited systems, with the DNO answering before anything is fitted, or the standard application. installHUB reads the job’s system size, supply and export limit to show which applies, and the job’s DNO checklist follows it.

More on G98 and G99 applications and DNO submissions.

The boundary

What it does, and what it doesn’t

installHUB runs the job and the paperwork, next to your design and monitoring tools.

What installHUB does

  • Battery enquiry with MPAN scan, proposed system, capacity and coupling
  • Battery survey covering backup needs, essential circuits, reserve, daily and night-time use
  • G98, G99 fast track or full G99 worked out from the job (Great Britain and Northern Ireland)
  • G98 Form B, G99 A1.1 and G99 A3.1 generated, or submission through ENA Connect Direct (UK)
  • DNO approval and notification checklist items before install and before close (Pro)
  • Crews where each document follows its trade (Pro)
  • Pre-start checks, serial scanning and install photos on the phone, offline
  • EESS commissioning report, battery handover document, electrical installation and testing certificate
  • MCS survey and MCS battery inspection and commissioning checklists, up to 50 kW
  • Irish wording on the commissioning report for jobs in the Republic of Ireland
  • Battery annual health check service plans

What it doesn’t do

  • Battery sizing, savings or tariff modelling for the customer
  • Inverter set-up, monitoring or remote diagnostics
  • Grid applications in the Republic of Ireland (ESB Networks applications aren’t built)
  • Issue the MCS certificate (MCS does)

What’s on which plan

Battery forms, the documents, scheduling, the mobile app and DNO submissions come with every plan. Job checklists, crews, card payments, the customer portal and the Xero and QuickBooks connection are on the Pro plan and later. Servicing is on Business and later. Every plan starts with a 1 month free trial.

Where it fits

Related pages

Questions

Battery storage installers, answered

What's the best job management software for UK electrical contractors doing solar PV and battery storage?+

Look for one that runs the job from lead to handover and handles the grid and MCS paperwork. installHUB is Installation Job Management software that does: a battery and solar enquiry and survey, scheduling your field operatives as crews, the G98 or G99 route worked out from the job, and the EESS commissioning report, handover document and MCS forms generated from what was recorded on site.

Can it manage MCS documentation for battery storage installs?+

Yes. For MCS-certified installers it produces the MCS survey form and the MCS battery storage inspection and commissioning checklists from the job, alongside the EESS commissioning report and the handover document. Above the 50 kW MCS limit the MCS forms are left out. The checklist won't let the job close until the MCS certificate reference is logged where the job needs one.

Does adding a battery mean a G99 application?+

It can. In Great Britain, everything on the premises at or under 16 A per phase is a G98 notification after commissioning; above that it's G99, either the fast track or the standard application. installHUB works out which from the job's system size, supply and export limit and prints it on the survey documents.

Can installHUB fill in the G98 and G99 forms?+

Yes. It generates G98 Form B, the G99 A1.1 application and the G99 A3.1 form from the job for DNOs you email, or you can submit through ENA Connect Direct. DNO submissions are on every plan.

What does the battery survey ask?+

Whether the customer needs power in a grid outage, for the whole house or essential circuits, for how long and with how much charge held back, how the battery will charge, daily and night-time use, then the supply, earthing, consumer unit, equipment locations, cable routes and risks.

Can our electricians sign their own certificates on a shared job?+

Yes, on the Pro plan. Book the job as a crew, each person with their trade, and each document follows its trade, so the electrical certificate is signed by the person who holds that trade on the job.

We're scaling beyond five crews on spreadsheets. What changes?+

Every job, survey, schedule and certificate sits on one record, field operatives work from the mobile app with or without signal, and the job checklist stops a job moving on with the DNO approval or the handover missing. The office stops chasing paperwork by email.

Can we handle commercial battery and solar jobs?+

Yes. There are workplace battery and workplace solar and battery forms alongside the domestic ones, and above 50 kW the MCS forms drop out while the electrical paperwork carries on.

Does it work for battery installers in Ireland or outside the UK?+

Yes. There's a battery form for Ireland and an international version, and on Republic of Ireland jobs the EESS commissioning report prints Irish wording: MPRN, ESB Networks, NC6 / NC7, EN 50549-1, I.S. 10101 and the Safe Electric Completion Certificate. G98, G99 and ENA Connect Direct are UK-only. Currency and dates follow your company settings.

GET STARTED

Ready to manage your jobs end to end?

Join hundreds of installation businesses running their full workflow on installHUB.

✓ No credit card required

✓ 1 month free trial

✓ Cancel anytime

Company

©2026 installHUB™ | A product of Khan Soft Ltd, registered in England no. 15956975, Unit C Piccadilly Business Centre, Aldow Enterprise Park, Blackett Street, Manchester, M12 6AE