Account and Setup

⌘K
  1. Home
  2. /
  3. Account and Setup
  4. /
  5. Getting started
  6. /
  7. Integrated user guide
  8. /
  9. See your scheduler by tra...

See your scheduler by trade

Pro plan

Available now on installHUB

On the scheduler, you can group field operatives by trade, show or hide trades, and see your contractors’ dates beside your own team. It helps you find a free roofer or electrician fast, and spot when a scaffold isn’t up in time.

Scheduler grouped by trade, trade chips bar, Roofwork and Electrics groups, contractor row

Group the scheduler by trade

The trade bar sits above the scheduler when Show by is Field operative.

  1. Next to Group by, click Trade.
  2. Each trade gets a header with its colour and how many rows it holds.
  3. Each field operative sits under their primary trade. Anyone with no primary trade sits under No trade.

Click None to go back to one list. The scheduler remembers your choice in this browser.

To give someone a primary trade, see Set up trades and skills.

Show or hide trades

The Trades chips filter the rows, whether or not you group by trade.

  • Click a trade chip to hide its people. Click it again to show them.
  • Trades that don’t fit the bar are under +2 more (or however many there are).
  • The count beside Trades shows how many are on, for example 3 of 5. Click it to turn every trade back on.
  • The Contractors chip shows or hides contractor rows.
Trade chips bar with one trade switched off and the +2 more menu open

Subcontractors

A field operative who works for a subcontractor shows SUB beside their name, with their business name underneath. They sit in the trade group of their primary trade like everyone else.

Contractor rows

Contractors you send requests to, such as a scaffolder, get their own rows at the bottom of the scheduler.

  • Each request shows as an all-day bar on its dates: the date on site (named by the request type, Date on site by default), then Planned removal, or Removed once it has come down.
  • A saved contractor contact sits in the group of the trade their requests cover. A firm covering two trades shows under both.
  • Requests to someone not saved as a contact go on an Unsaved row named, for example, Other scaffolding contractors.
  • A contractor with no trade sits under Other contractors. A saved contact keeps its row even with nothing booked that week.
  • A contractor who is also one of your subcontractor field operatives has no row of their own. Their bars show on that person’s row.

To change a contractor’s date, drag the bar to another day. The dialog asks to Change that date and shows the old and new dates. Click Change date and re-send. The brief goes out again as the next version and shows Changed until the contractor acknowledges it.

Contractor row with the Date on site bar

Installer network rows

If you book field operatives from installer network members, their rows sit inside the trades too. Each one names its member company and how you can book them. A network field operative goes under the trade that matches theirs. When there is no match, they sit under No matching trade.

With Group by set to None, network members stay grouped by company as usual.

See a whole install plan

Click a visit or a contractor bar on a job with an install plan. The scheduler highlights every step of that plan and shows Showing plan for # the job reference and the number of steps. Click the X on that chip to clear it.

The plan order warning

Each step of an install plan can wait for another, for example the roof work waits for the scaffold. If you move a visit or a contractor bar so that a step now comes before the step it waits for, Plan order broken opens and says which step is now too early.

  • Undo move puts it back.
  • Keep anyway keeps the move. Keep anyway is saved on the job’s history with your name and the time.
Plan order broken dialog with Undo move and Keep anyway

Filter the jobs calendar by trade

With Show by set to Customer job, the jobs calendar has an All trades filter. Pick a trade to show only the jobs where someone on the visit holds it. Each job card lists everyone on the visit with their trades, and marks the Visit lead.

See See your schedule by customer job.

Questions and fixes

I can’t see Group by. Check Show by is Field operative and close the booking form. Your company also needs at least one field trade switched on, under Settings, Jobs & Installations, Work & trades.

Someone is in the wrong trade group. They sit under their primary trade. Change it on the People tab of Work & trades.

A contractor bar won’t move. It can’t be moved once the request is closed, or once the removal is recorded.

Related guides

Still stuck? Contact

How can we help?

©2026 installHUB™ | A product of Khan Soft Ltd, registered in England no. 15956975, Unit C Piccadilly Business Centre, Aldow Enterprise Park, Blackett Street, Manchester, M12 6AE